The Working Drawing stage includes the preparation of fully documented and detailed drawings and specifications for the purpose of applying for Building Consent. These drawings can also be used to gain accurate costings for construction.
This stage really covers how we want the building to be constructed, and demonstrates compliance with the Building Code as per Council requirements. It's really the 'nuts and bolts' of the process.
Depending on the scope of the project additional consultants may be required for this stage. These may include:
- Structural Engineer
- HVAC Engineer
- Fire Engineer
- Acoustic Engineer
- Geotechnical Engineer
Next Step
Building Consent application